← Back to the tracker

Jaclyn handover

Little West product pages. For Jaclyn (Little West). Built 25 Sep 2026, 11:33 UTC from the tracker; the tracker is the master.

These are the points where we need a decision or a confirmation from you before the team can finish. Each one says what is on the site today, why it looks that way, and what we need back. A short reply per item is enough; we will do the work.

Open items (1)

#19Classic shows the old 2-day-vs-3-day explainer block

ContentWhatsAppOpen
Where
key.slide_content on Classic
What is wrong
kit-product.liquid 123 shows the How to Cleanse section whenever slide_content has text. It has text on Classic, 5/7 Day and one more. Not a regression.
What to do
Clear the field if the block is unwanted, or keep it and say so.
Evidence
Re-checked 21 Sep: the 2 day vs 3 day explainer block still renders on Classic. Waiting on Jaclyn.
Pages
classic-2-3-day-juice-cleanse
Asana
Not in Asana
Already closed (3)